Timberlake Water System Replacement Project

Water Tower

 

Franklin County Department of Sanitary Engineering is pleased to announce plans to replace the existing water distribution system within the Timberlake Subdivision located in Pleasant Township. This project includes the following:

  • New mains, valves, and hydrants
  • New water services from the main to the property line
  • New meters located inside pits within the right-of-way
  • New elevated water tower
  • Repaved asphalt roadways

Design of the project will be funded by the Water Supply Revolving Loan Account (WSLRA), which is jointly administered by the Ohio EPA and the Ohio Water Development Authority. 

Construction will be funded by a Federal earmark from U.S. Department of Agriculture along with funds from WSLRA and the Ohio Public Works Commission.

Design is anticipated to start first quarter of 2027 with construction following in early 2028 and completing in 2029.

To provide further information on the project and its funding, the Department of Sanitary Engineering is having a public meeting on August 26, 2026 at 6:00 PM at the Pleasant Township Fire Department (5373 Norton Rd, Grove City, OH 43123).

Please click here(PDF, 203KB) to see the Public Meeting Notification. 

Please click here(PDF, 513KB) for the Public Meeting Handout